250 MW hybrid power plant planned in Khmelnytskyi region

According to UkraineInvest, a 250 MW hybrid power plant is planned in Khmelnytskyi region with investments of €156 mln. The estimated construction period is 24 months.

Capacity and technology of the plant

The project foresees combining solar generation with energy storage systems. The storage systems will retain generated electricity and use it when solar generation decreases.

The document also states that this solution helps to balance loads on the power system.

Partners and memorandum signing

The project will be implemented by Smart Estate Life SE and the Ukrainian limited liability company (TOV) "Tesla Energo". The cooperation on implementation was formalised on 13 November during the ReBuild Ukraine 2026 international conference in Warsaw with the signing of a memorandum.

power lines and transmission towers over fields

It was stated that this is a planned project at present, not construction that has already started.

Investments, timelines and jobs

The planned investment volume is €156 mln. The estimated construction period is 24 months.

During construction about 200 temporary jobs are expected to be created and a further 20 permanent positions after the facility is commissioned. This organisation will coordinate further work on the project, including seeking instruments of investment support and liaising with state authorities to start construction.

Iryna Pavlova

Iryna Pavlova

Deputy Editor-in-Chief

Deputy Editor-in-Chief of Concord Fintech. She runs the news feed: choosing topics, fact-checking and preparing stories on the economy, business and government decisions that affect Ukrainians' money. She makes sure every story has a verified primary source.

All author's materials (1798)

Leave a reply